Статья
|
29 August 2022
Estimated constructor
Construction and other companies that perform contract work need to calculate the estimate of work before starting work.
Typically, such an estimate is then included in the contract as an annex.
You can calculate the estimate in the old way: generate a technical task, manually calculate the amount of materials and their cost, the period of work and the cost of each type of work, sum it all up and get an approximate final figure. You can even use Excel for the calculation.
Typically, such an estimate is then included in the contract as an annex.
You can calculate the estimate in the old way: generate a technical task, manually calculate the amount of materials and their cost, the period of work and the cost of each type of work, sum it all up and get an approximate final figure. You can even use Excel for the calculation.